Water and gas drainage for caps
At the end of their operation, landfill cells must be closed and covered with topsoil. AFITEX MIDDLE EAST offers a number of drainage solutions to equip these caps :
- DRAINTUBE® FT for draining rainwater over the waterproofing layer and biogas under the waterproofing layer
- DRAINTUBE® FTP for draining rainwater and semi-water barrier the cover