Water and gas drainage for caps

At the end of their operation, landfill cells must be closed and covered with topsoil. AFITEX MIDDLE EAST offers a number of drainage solutions to equip these caps : 

  • DRAINTUBE® FT for draining rainwater over the waterproofing layer and biogas under the waterproofing layer
  • DRAINTUBE® FTP for draining rainwater and semi-water barrier the cover